Stop the next on-set tragedy before it makes the call sheet.
On the Rust set, seven of the ten classic risk factors were unambiguously present before a single frame turned fatal. Stunts, firearms, pyrotechnics, height, vehicles - all under unrelenting schedule pressure. Intuety surfaces the signals other systems miss, turning fragmented risk knowledge into safe execution across every unit, location, and contractor - so the next serious incident never makes it onto the call sheet.
Trusted by industry leaders
Intuety In Action
What's Keeping Production Safety Leaders Up at Night?
In film and TV, there is a lethal gap between a minor near-miss and the events that kill or maim. If you treat every risk the same, you aren't managing safety - you're just managing paperwork.

Schedule Pressure Is Pushing Crews Past Safe Limits
14 to 16-hour days, short turnarounds, and last-minute rewrites have shifted from exception to expectation. When the call sheet outpaces the risk assessment, life-critical controls get skipped - and crews pay the price on the drive home as well as on set.

Critical Safety Know-How Lives in People, Not Systems
The judgement of veteran stunt coordinators, armourers, riggers, and SFX supervisors is the real line of defence. When freelance crews rotate every shoot, that knowledge walks off set with them - leaving the next production to relearn the same lessons under the same pressure.

Fragmented Contractor Chains Are Hiding Real Risk
Producers can't manage what they can't see. Across stunts, SFX, animals, vehicles, locations, and construction vendors, without real-time visibility into how work is actually being executed, nobody can verify the controls are in place - or that the next incident isn't already in motion.

Paper Risk Assessments Can’t Keep Up With Production
Stunt rehearsals change. Locations get swapped. Weather forces re-blocking. Yet RAMS, permits, and safety briefs still live as static PDFs in shared drives. Unstructured information becomes a barrier - not an asset - when decisions need to be made in minutes, not days.
Core Pillars of the Intuety Platform
Every feature purpose‑built to protect your most critical asset: your people.
Platform Pillars
SMART RAMS
AI-powered Risk Assessment Method Statements that identify high-energy risks automatically and prescribe the exact controls needed.
Document Scoring
Instantly score and benchmark safety documents against industry standards, flagging compliance gaps before they become incidents.
Compliance Coverage Scanner
Run gap analysis across your entire document library to surface missing controls and verify regulatory coverage in real time.
Smart Search Vault
Instantly surface related documentation, precedents, and controls from across your organisation's entire knowledge base.
Intelligent Analytics
Real-time dashboards that translate raw safety data into actionable intelligence - track SIF trends, control effectiveness, and supplier performance.
Intelligent Document Queries
Ask questions of your safety documents in plain language. Get verified, cited answers - not AI guesswork.
Strategic Brief & Distribution
Automatically generate and distribute targeted safety briefings to the right teams at the right time, ensuring frontline awareness.
Multi-Language Support
Dismantle language barriers across your global workforce - safety documents and queries in any language, with no loss of precision.
One unified platform.
Every capability you need to prevent serious incidents and fatalities on set - from stunt and SFX permits to live compliance, contractor visibility, and AI-driven insights across every unit.

The Hazards That Actually Kill on Set
Traditional production safety misses what matters most. Intuety targets the high-energy hazards behind serious injuries and fatalities - directly.
Falls from height
Stunts & rigging
Picture vehicles
Pyrotechnics & SFX
Firearms & armoury
Fatigue & long hours
Ready to Protect Your Cast and Crew?
Choose the only AI platform purpose‑built to prevent Serious Incidents & Fatalities on set. Book a personalised demo with our team today.
Live SIF walkthrough
Graph risk mapping database
Real-time analytics & gap analysis
90-day implementation roadmap


















